今天小编在这给大家整理了电气英文自我评价,本文共12篇,我们一起来看看吧!

篇1:电气英文自我评价
My name is ***, engaged in electrical equipment repair work has been 5 years. Since *** *** *** years to *** *** company, has been working for more than two years. From entering the company has been engaged in substation operation and maintenance and management. Has participated in and organized a high-pressure measurement and relay protection setting and calibration; reactive power compensation and voltage setting; DC screen inspection and maintenance; substation secondary circuit fault and processing; high-voltage cabinet failure and treatment; high-voltage cable head Production and processing; substation in the spring and autumn all overhaul and maintenance; outdoor high voltage overhead line fault handling and maintenance. I always assiduously with high-voltage technology to improve the operating rate of the combination, and actively study the principles of high-voltage equipment and maintenance experience, and insist on constantly improve their theoretical and practical skills to solve the substation running a lot Technical problems, in order to improve the power transmission and transmission equipment operating rate and laid a good foundation. Substation is the power system in the power of the voltage and current transformation, concentration and distribution of the place. In order to ensure the quality of electrical energy and the safety of the equipment, voltage regulation, power flow and voltage distribution, distribution of power, current and power in each node and branch of the power system and control of transmission and distribution lines and Protection of major electrical equipment. Now substation over the past two years have experienced the work summarized as follows:
1, vacuum circuit breakers in the daily operation of the fault types and treatment.
November 8, due to power company line fault on my company large power outage for 3 hours. After receiving the notice, we press the power substation regular power outage procedures for power outages. When the power company to deal with failure after transmission, according to power transmission step. Then found the 35KV main transformer vacuum circuit breaker refused to close, this is my company has just put into operation for two months the first time the substation problems, our company substation 35KV high voltage cabinet vacuum circuit breaker is applied Chint ZN85-40.5 circuit breakers. In the experimental state found after closing the circuit breaker command, closing electromagnet action, the core plunger will close the pawl top open, closing the spring release energy, driving the circuit breaker closing, but the circuit breaker interrupter can not be together brake. After analysis, indicating that mechanical failure has been excluded, indicating that the secondary line fault, found in the secondary auxiliary plug has a needle and control wire desoldering, vacuum breaker to deal with after closing, fault problem solving. Vacuum circuit breakers in the daily work of the most prone to failure to be summed up: 1. Positive air circuit breaker refused to sub (gate)
2. Vacuum circuit breaker body energy storage, energy storage motor stop 3. Vacuum interrupter interrupter can not be disconnected 2, the current transformer secondary open and deal with
*** * The end of the month, the power company came in February of the electricity details, with my company substation measured by the amount of difference 2KW.h. I led the technical staff to conduct a comprehensive inspection of high-pressure measurement, due to limited conditions, failed to find fault problems. The company invited the power company metering and testing center substation secondary circuit test. The current transformer, voltage transformer, secondary voltage drop and secondary load, electric energy meter of 35KV and 10KV each switch cabinet are tested. In the power company equipment testing found 35KV high back-up protection of the terminal has an indirect open phenomenon. After processing, in the specified time with the power company metering center, the problem has been resolved. Current transformer CT primary winding number of turns is small, the use of a winding in series in the measured line, the secondary winding turns, and measuring instruments and relays and other current coil in series, measuring instruments and relays and other current coil impedance is very small , So the normal operation of CT is close to short-circuit state. CT secondary current size determined by the primary current, secondary current generated by the magnetic potential, is to balance the current magnetic potential. If the secondary open circuit, the impedance is infinite, the secondary current is equal to zero, the magnetic potential is equal to zero, can not balance the current generated by a magnetic potential, then a current will act on the excitation, the core serious saturation. Magnetic saturation increases the iron loss, CT fever, CT coil insulation will be burned by overheating. But also in the core to produce remanence, increasing the transformer error. The most serious is due to the magnetic saturation, alternating sine wave into a trapezoidal wave, the rapid changes in flux moment, the secondary coil will induce a high voltage, the peak up to several thousand volts, so high Of the voltage on the secondary coil and the secondary circuit, the person and equipment are a serious threat.
3, to complete the good leadership of the other basic and temporary work assigned.
Over the past year, I am learning and working in the gradual growth and maturity, but I know there are many deficiencies, such as lack of ability to work and innovation, lack of political theory to be improved and so on. In the future I will try to do the following, I hope the leadership and comrades of my supervision and guidance:
1, consciously strengthen the study, to the theory of learning, to professional knowledge learning, learning to colleagues around, and gradually improve their theoretical level and operational capacity.
2, to overcome the young gas impatient, so down to earth, improve work initiative, not afraid to do more things, not afraid to do small things, improve the practice in the bit to improve themselves.
3, continue to improve their political accomplishment, strengthen the sense of purpose of serving the people, and strive to become an outstanding national civil servants.
篇2:电气英文自我评价
Time is always footsteps, how long a year? Three hundred sixty-five sunrise, three hundred sixty-five sunset only, XX in the alternation of sunrise and sunset in the past, look back this year's work And life full and half at a loss.
This year I am still in Beidaihe sanatorium overall renovation project is responsible for electrical work. In the first half of the main construction, electrical construction to do with the civil pipe buried and ground lightning protection work, electrical project construction team is the local construction company in Qinhuangdao, construction quality and the quality of the construction team in Beijing is not the slightest difference, the local quality inspection Department requirements are too low, so the first half of my identity is another professional quality inspectors, for their strict requirements but also to provide their own learning opportunities, in order to convince others of course, there are good reasons, professional aspectsShould have a solid professional knowledge.
This project has a special case, close to the beach, the ground is hard rock, which encountered two situations, one, the seaside corrosion is particularly heavy, the original design of all used galvanized steel pipe and welded steel pipe, the general situation Under the two management is the most durable, but not applicable at the beach, whether galvanized pipe or welded steel pipe bare in the air not more than two weeks above the thin layer of corrosion is a layer of light touch It peeling off. Brush off the anti-rust paint had no effect. Project supervision to me when drawing this point, the beginning of half-doubt. In the design of the consent of the ground only part of the strong power to pvc pipe, concrete pipes are also used galvanized steel pipe, summer and a half months after the suspension, the site reserved for structural columns, steel pipe surface is a thick one Layer rust, I am surprised I secretly delighted: really do not listen to the old man made a loss in sight, the experience is really useful ah! Second, because the basis of the following are all rock, lightning effect is not good, the original design lightning protection grounding Practices fail to meet the requirements of the standard value, and other building foundation is not connected to the case can only fill the ground electrode or add resistance reduction agent.
Beidaihe due to the suspension of the project a month and a half, but also because of the renovation project we went to Shanghai. Shanghai is a bustling city, surging in the city is the latest fashion, her architecture has its own unique style, we have seen in Shanghai, known as the Bund Building known as the Bund buildings, a taste of the past Far East Wall Street wind color . Bank of China, Peace Hotel, Customs House, HSBC Bank & .. These buildings are not from the same designer hand, is not built in the same period, but their architectural tones basic unity, the overall contour processing surprising coordination, Whether it is overlooking or wander in the meantime can feel a vigorous and vigorous, elegant and imposing manner. The short trip makes me realize that their vision of the narrow, lack of knowledge, personal small, Jinmao Tower, the Pearl of the Orient really is out of reach?
The second half of my work is mainly responsible for the room electrical pipeline laying and power supply and distribution programs, electrical piping laying should be very simple, but because the program is not sure the drawings imperfect, my role constantly transform, live doing some powerless. But better be regarded as a test of their own right, more opportunities for more growth.
Originally thought that the power supply program will be a good run, the fact once again taught me a lesson: underestimate the enemy will be beaten.Shanghai's design with this can not be used in the Beidaihe area, no way everything from scratch, knowledge is learned in a setback. XX years of work, life in contact with more and more 80 or 80, to see them one by one in their respective fields to show their mettle, ambitious look, inner panic arises spontaneously.
篇3:电气自动化英文自我评价
An excellent electrical engineer with 15 years of electrical work experience.To seek the position of electrical engineer, in order to give full play to 10 years of state-owned enterprises and five years of foreign engineers work accumulated by the rich professional knowledge and skills, including the design and review of electrical drawings, various industrial field automation control system installation and commissioning, Of the commercial negotiations and on-site installation commissioning and guidance, all kinds of imported equipment maintenance and maintenance.
I hope to be able to use my knowledge and accumulated work experience to better serve your company while maximizing the interests of the enterprise. During the project construction period or after the factory is put into operation, I hope to be an electrical engineer.
篇4:电气自动化英文自我评价
In short, through a year of productive labor and technical learning, I thought and technically have been greatly improved and progress. That is, broaden the horizons, a wealth of knowledge, but also improve their management and operational level, the most important thing is for their own work in the future, to better completion of the task to lay a good foundation.
In the political and ideological aspects have also made great progress, I actively move closer to the party organization, through the cadre study, understanding of the social development of the new situation and new trends, deepened understanding and understanding of the Communist Party of China in the spirit of the 17th CPC National Congress Under the guidance of more efforts to achieve individual ideological progress and leap in the struggle more than.
Summed up the work of the past year, that there are many problems and shortcomings. In the future work, only the continuous careful summary, found deficiencies, correct shortcomings, individuals can get faster progress. I think I work well.
篇5:电气自我评价
1、本人学习能力强、做事认真负责、沟通能力好,较强的动手能力。
2、处事能力强,容易适应新环境,能够迅速投入新的工作。
3、有良好的电路、PLC、自动控制和本专业知识基础和英语读写能力,熟悉office、autocad、photoshop、S7-200、一、二次线路。自学能力强,在业余时间通过网络和自考不断充实增加自己的知识面。希望贵公司能够给我一个为贵公司创造效益的机会。
范文二:
大学的生活结束了,回忆四年的历程,就要离开学习和生活过的地方,而迎面而来的将是社会的锻炼,于是更加的怀念这个紧张而有序的大学生活,她给我留下了很多美好回忆,我孜孜不倦,勇于挑战自我,充实自己。
在学习上,除了学习主修课之外。还利用课余时间专修计算机,使我能熟悉各种网络和办公软件。曾获过二等奖,除了在专业知识方面得到好的成绩,平时我还涉猎了很多网络编程,网络管理与维护,网页设计等知识。
有句俗话是这样说的:不谋全局者,不足以谋一时,所以我不倦地寻找机会锻炼自己。在低处做起,一步一步往上爬,而作为干部,感觉就像在自己的生命上添上了精彩的一幕,成为了另一种无形的力量在鼓励我,让我在修养方面能够有品德优良、正直诚恳;在性格方面为人谦虚有亲和力,能有很好处理人际交际的能力。在工作方面能塌实,任劳任怨,责任心强,具有良好的组织交际能力。我结合自身的特长,曾在校团委举办的手工制作大赛获奖。由于工作积极努力,成绩突出,被评为校“优秀共青团员” ,得到老师和同学们的一致好评。无论工作多累,多繁琐,都不再是一种疲惫,而是一种满足和快乐。
最大的收获是心理的成熟,一千多个日子里曾悲伤过、失落过、苦恼过,委屈过。而现在懂得擦干眼泪,站起继续往前走,前面的荆棘,算不了什么,路上的阻碍,我每攀登跨越过一次,便离云端更近了一步。 使自己的知识水平,思想品德,工作能力等方面都踏上了一个新的台阶。
作为一名电气自动化专业的大学应届毕业生,我所拥有的是年轻和知识。年轻也许意味着欠缺经验,但是年轻也意味着热情和活力,我自信能凭自己的能力和学识在毕业以后的工作和生活中克服各种困难,不断实现自我的人生价值和追求的目标。
篇6:电气自我评价
为人真诚坦率、性格活泼开朗,能吃苦耐劳,心理素质好,能很好地与人沟通,人际关系好。
在校期间,一直担任主要学生干部,工作责任心强,有较强的组织能力和逆境适应能力;有较强的团队协作意识,作风严谨;对事物有敏锐的洞察力,对负责的工作会付出全部精力和热情,制定缜密计划,力争在最短时间内将目标达到;喜欢挑战,能在较短时间内适应高压力的工作。
篇7:电气自我评价
喜欢在工作与学习中提高自己各方面的能力,特别是实践动手能力,实习的过程中既能体会到个人的能力与专长,又能注意整体的协作配合问题。
有很好的团队精神,喜欢在与大家的共同努力协作中取得成果,分享快乐。做事认真负责,诚实守信,能较好地处理人际关系。吃苦耐劳,不畏挫折,从不轻言放弃。认为只有从基层做起,对自己严格要求,通过不断的学习深造才能在整体上提高自己。爱好音乐、体育运动和阅读,从而在学习工作之余来放松自己的身心。
篇8:电气自我评价
活泼开朗、乐观向上、兴趣广泛、适应力强、勤奋好学、脚踏实地、认真负责、坚毅不拔、吃苦耐劳、勇于迎接新挑战。
有较强的组织能力、活动策划能力和公关能力,如:在大学期间曾多次领导组织班级春、秋游,并取得良好效果。有良好的人际关系;在同学中有较高的威信;善于协同作战。我会以实力和热诚的心面对将来的挑战,吸取经验,丰富自我,从而很好地实现人生价值。
篇9:电气自我评价
在大学几年,我严格要求自己,努力在各方面提高。认真系统地掌握了工业电气自动化及仪表自动化的相关课程,取得了良好的成绩。在班里担任班长,在学生会纪检部工作,在校期间多次获三好学生,二等奖学金2次,三等奖学金3次,一次国家励志奖学金,优秀班干部2次,优秀学生会干事1次。我有良好的组织沟通能力和丰富的电气工程及自动化领域知识电气工程师自我评价电气工程师自我评价。我相信我有能力担当电气工程师这一职位。
在即将走上社会岗位的时候,我像贵公司毛遂自荐,企盼着以满腔的真诚和热情加入贵公司。希望能够我一个机会。
篇10:电气学院自我推荐表英文自我评价
In the four years of university study, I continue to challenge themselves, enrich themselves, advancing with the times, all-round development of their own should have the ability.
In the study, I earnestly study specialized courses, study hard, study achievement is outstanding, has won two first-class scholarship, a second scholarship, a third scholarship, also won the honorary title of outstanding students .Digual learning combined with social practice, With a strong ability to learn and analyze and deal with problems, in addition, the computer also has the basic knowledge, economics, business management and other related professional knowledge.
In thinking, I am aggressive, have a higher ideological consciousness, advancing with the times, concerned about national affairs.
In life, I am lively and cheerful, patient, optimistic, and often communicate with teachers, and students get along well, helpful, good at listening to others opinions, brainstorming, a strong sense of responsibility and good interpersonal relationships, A wide range of friends, have good communication skills.
I am interested in a wide range of expertise is the sprint, long-distance running, has won the 200-meter sprint the second place of success, in the school to join the Taekwondo Association, many times to participate in college leagues, and referees with the relevant knowledge and technology,And actively participate in a series of school activities, such as the athletic meet aerobics, new performances and a number of public fund-raising activities, etc., which not only makes me enhance physical fitness, but also makes me more strong and confident. I have learned a number of ways of doing things, have better organizational coordination, but also accumulated some experience for the future work laid the foundation.
I realized that I still have a lot to learn, so in the future I will be optimistic about the work and study, so that their more comprehensive development.
With a certain career development prospects, will help me improve the relevant professional skills, and core competitiveness of the professional positions.
篇11:电气工程项目自我评价
主要为钢铁冶金方面如轧线,炼钢,烧结,炼铁,化工以及民用建筑等方面工程项目的电气设计工作,主要参与设计工程有:
冷轧磨辊间,钢丝处理工程,大型烧结脱硫工程,生活污水处理,废酸处理,化工公司供配电系统改造,石灰窖变频及控制系统改造,某区派出所等工业与民用项目设计工作。参与项目既有工业电气自动控制系统的设计,又有高低压供配电系统,变电所,传动系统,民用住宅,办公楼等公建项目的电气设计。
至今完成大小工程项目超百余项,投资亿元元以上项目十余项,主要担任部门电气专业负责人,主任工程师,注册电气工程师,项目经理等职位。
一名出色的电气工程师,XX年电气工作经验。谋求电气工程师职位,以充分发挥XX年国企和XX年外企电气工程师工作所积累的丰富专业知识和技能,包括电气图纸的设计与审核,各种工业现场的自动化控制系统的安装与调试,新建项目的商业谈判与现场安装调试与指导,各种进口设备的维护与保养等。
谋求电气工程师职位,希望在项目建设期间或工厂正式投产以后,能利用我所掌握的知识和积累的工作经验,更好的为贵企业服务,同时使企业的利益最大化。
篇12:电气工程师自我评价
由于长期做电脑主板,所以对主板的布线规则及注意事项相当了解。布线过程中会考虑到emi,信号时序,散热等问题。能独立完成网表导入到出gerber整个流程,后期可以和洗板厂和打件厂联系解决工艺方面的问题。会建零件维护零件库。能基本看懂英文layout guide。具有良好的团队精神,能紧密配合硬件,散热,电子方面的工程师。使用的layout工具为allegro并且非常精通。所做的板子多次量产,为公司创造了良好的效益。也希望做一些不同的产品来提升自己,学到更多的东西。我的接受能力和耐心程度都可以,对于新的东西能迅速上手。
文档为doc格式